KVL project

The program for the design of 0.4-500 kV cable lines and the

preparation of project documentation !!!

Next work:

1). For cable line:

- add communication editor in profiles;

- we continue to add trench cuts, reinforcement, etc. (+dwg);

- to calculate the bandwidth and transposition make the result output in docx;

- add the option of laying cable lines along the structures on the "on the track";

- BricsCAD, NanoCAD (polyline and multiline first) etc.;

- construction of a line diagram, transposition diagram;

- add calculation of earth volumes from open laying profiles;

- add new types for CL elements: designed, dismantled, existing;

- "flattening" the profile of a closed transition;

2). In the "Volume Editor" add automatic splitting of the trace into sheets and placement of conditional

designations according to the location on the sheet;

3). Continue with the interface;

4). Joint work with power transmission lines (ЛЭП ПРО) PRO (electrical calculation, etc.);

5). Automatic profile rebuilding in accordance with communications;

6). Construction of a security zone for a cable line (nuances);

7). Various cable magazine options;

8). Автоматическая расстановка маркеров и реперов;

9). Automatic placement of markers and benchmarks;

10). Adding custom supports and TS to the work of the program;

KVL project version №2.2:

1). The application for the generation of as-built documentation has been completed: the list of documents has been updated

(>30 pcs.), added options for filling in signatures, added filling out documents for the cable line;

2). Editing communications in profiles has been added to the "new properties";

3). Other changes:

- the command for checking the route and defining more complete parameters has been added to the design;

- code optimization in the application for the generation of working documentation;

- work has begun on adding / building a substation;

- updated work taking into account user wishes.

KVL project version №2.1:

1). Added new properties - similar to the "Adjustment" tab. "Full" adjustment: cable

line, cable poly/multiline, cable box, pipe block, closed transition;

2). Other changes:

- added arrangement of coordinates for selected blocks;

- added SQL installer to the program;

- route template updated, multiline styles added for cable line design;

- corrected work with horizontal directional drilling profile;

- added template selection when generating the main cable line files;

- remove multiline text formatting when defining Z marks;

- code optimization / application acceleration;

- added editor for sizing between supports/blocks;

- corrected the construction of a guard zone for a single-circuit line made by blocks and

a polyline;

- updated numbering of the route and binding of sections, taking into account the poly/multiline;

- edited the construction of the profile of the open laying, taking into account the poly/multiline;

3). Added picket placement in accordance with the road picket for lighting poles + list

of poles;

4). Added a list of CL intersections with the definition of distances to utilities. Corrected

dimensioning for horizontal directional drilling;

5). Formation of files with filling of the main frame. Select projects to complete;

6). The construction of the route has been completely redone, taking into account the poly / multiline and the new binding between

the sections;

7). The design of several lines at once has been added to the express panel;

Version №2.0:

1). Building an open laying profile:

- edited interface and algorithm for building a profile;

- corrected profile building for one chain with pipe + case;

- roadway construction added;

- corrected calculation of slabs under the road (+ specification and bill of work);

- added the second step of automating the construction of a profile, taking into account communications;

- added picketing in profile;

- added poly/multiline accounting;

2). Added commands to the express panel for designing the cable line route, taking into account the cable multi / polyline;

3). Added linking the profile to the horizontal directional drilling block on the route (taking into account when forming the specification and placing marks on the track);

4). Other changes:

- corrected the construction of the pipe (snap to the line + the same point);

- added plotting a line with an offset (so far without the "Continue" command).

KVL project version №1.0:

1). In the profile of the closed transition, I corrected the construction of the well - “the binding flew off” when

constructing the horizontal section of the well. Completed commands for building wells "under each other"

2). Added Z marks from other programs to closed and open strip profiles. Corrected

construction of the earth ("black / red") in profiles;

3). Started work (long term) on window view/UI for various screen extensions.

Redesigned "welcome" and "build menu" windows;

4).Corrected construction + conjugation of straight sections. Added option to complete the cable line section with a coupling

5). Изменена работа и интерфейс каталога и базы данных (теперь видны пользовательские изменения).

Added commands for working with the user base. Now you can quickly add all your changes to the KVL project database;

6). The "Track Editor" has been completely redesigned. Changes in the editor are immediately "reflected" on the track in AutoCAD

7). Added two window themes KVL project in general settings;

Version №1.1

1). Added construction of a polyline by coordinates in the "Design" tab;

2). Added overlay on the section of the cable line route;

3). Completely redone;

4). Fixed problems during installation of the program and in the interface.

Version №1.2

1). Added arrangement of coordinates along the track;

2). Added general leader of the route with lengths;

3). The placement of communications in profiles has been corrected (arrangement of several communications at once + fence);

4). Other changes:

- added file autosave when saving a line;

- corrected placement of PO marks along the polyline;

- track update corrected (project parameters were not updated);

- added rhombus coupling;

- added additional program protection;

5). Added cable magazine to the design (Option No. 1);

6). Added placement of cuts along the track (pictures for now);

Version №1.3

1). In the volume editor, added / corrected the arrangement of labels in AutoCAD when exporting to a sheet or sheets;

2). Other changes:

- corrected the formation of the application using PDF24;

- corrected the offset of the pipe when the value is 0;

- changed work with the definition of the active file in the design tab;

- added the ability to stop the process of printing and processing documents in the volume editor;

- corrected the saving of line parameters in the project;

3). Now the demo-key activates the full version of the program for two weeks!

4). Started work on the joint design of cable lines and overhead lines: so far added the definition of common

Started work on the joint design of cable lines and overhead lines: for the time being, I have added the definition of general parameters of the overhead line, the construction of a polyline along the axis of the overhead line, the placement of pickets / stationing, the placement

coordinates, list of coordinates, added calculation of the preliminary specification of waterline, formation

cable magazine;

5). Added determination of distances to utilities along a polyline with arc segments.

Version №1.4

1).Added verification of allowable distances to utilities in the profiles of open and closed laying using the horizontal directional drilling method

2). Added an example of a CP route with hiding the background of points and leaders;

3). Added (manual so far) placement of markers and benchmarks + their calculation in the specification;

4). Other changes:

- additional filters for corrected positions added to the catalog;

- added message about new videos;

- added new options for the location of callouts for marks of closed transitions;

- catalog work corrected - there was an error when saving positions if the parameter was deleted;

- changed the formation of specifications and bills of quantities, taking into account sections;

- updating the database;

5). Added output of cable bandwidth calculation in PDF;

6). Big changes in the "Adjustment" tab. Added the ability to change several sections of the cable line

7). Added binding of adjacent line segments. Changed the work of the "Snap" command.

Version №1.5

Added an alternative to CL - "Cable polyline and multiline". The construction of the line, the formation of the specification have been corrected, the “Adjustment” tab has been changed, the “Design” tab has been changed - general data, route leader, trench cut, cable log, collaboration, etc...

2). Other changes:

- corrected the formation of specifications and work sheets;

- corrected well construction in horizontal directional drilling profile, added checks…;

- fixed an error in the formation of the final specification, taking into account the sections for horizontal directional drilling;

- "Much" accelerated the formation of a list of coordinates along the polyline;

- replaced the 2d-polyline with a polyline in the design;

- corrected quick properties

- added additional features for multiline: connection, and transformation of a polyline into a multiline and back in the "adjustment" tab;

- started adding nanocad;

- added an application for the formation of executive documentation;

3). Added general final specification for KVL;

4). Added construction of a guard zone;

5). Added calculation of the cost of preliminary and final specifications in the joint work of KVL;

6). Added cable magazine according to GOST 21.613 form 6 (not yet taking into account closed transitions);

7). Edited interface and operation of the database / trench editor. Added a new section - laying on metal structures;

8). Added express panel.